
Published: 4 Sep 25
The Order shall come into operation on the 25th September until 29th September 2025, operating between 08:00 – 17:00. The order is necessary for poling and cabling works to take place in a safe manner at the location. Reasonable access will be maintained for properties fronting the affected lengths of road during the period of the closure. The effect of the order will be to temporarily close a section of B4233 Trothy Bridge to Pen-Y-Parc, Llantilio Crossenny, west from its junction with Llanarth Road for ~0.70km. A signed diversionary route will be in place. Details can be found on the linked page. Read More...